PPA for Data Centres UK: On-Site vs Corporate PPA

How a UK data centre PPA works: on-site vs corporate PPA, Scope 2 treatment, hourly CFE, contract types and the questions to ask before you sign.

Published 12 May 2026 · SEO Dons Editorial

A PPA for a UK data centre is a contract to buy electricity from a named renewable source at an agreed price, and it takes two forms. An on-site PPA has a funder own a solar array on your roof or land and sell you its output. A corporate PPA is a longer, off-site contract with a wind or solar generator, often for 10 to 15 years. Most operators with a renewable target end up using both, because they do different jobs.

This guide sets out how each route works, how each is treated under Scope 2 rules, what each contributes to hourly carbon-free energy (CFE) matching, the contract types you will be offered, and the questions to put to anyone quoting you a PPA. It is general information drawn from the cited sources, not legal or tax advice, and it gives no PPA prices because they are negotiated and move with the market.

What each route provides

On-site solar puts photovoltaic panels on the data centre’s own roof or on adjacent land. The electricity is used at the point of generation, with no grid transmission involved. You can buy the array outright, or a funder can own it and sell you the output under an on-site PPA; the on-site PPA guide covers that contract in detail.

A corporate PPA is a supply contract with an off-site generator. The power reaches you through the grid, and the generator’s Guarantees of Origin (GOs) are retired against your consumption so that the covered volume can be reported at zero under the market-based Scope 2 method. Ofgem runs the REGO scheme that issues the certificates for UK generation.

Types of PPA you will be offered

The price is only one of the terms. These choices change the risk you carry:

  • Physical (sleeved) or virtual. In a physical, or sleeved, PPA a licensed supplier delivers the generator’s output to you and manages the gap between generation and your load for a fee. In a virtual PPA there is no physical delivery: you keep buying from your supplier, and a financial contract settles the difference between the PPA price and a market price.
  • Pay-as-produced, baseload or shaped. Pay-as-produced means you buy whatever the plant generates, so you carry the risk of buying the rest on the market. A baseload or shaped product is closer to your flat demand, with the generator or an intermediary carrying the shape risk, at a price that reflects it.
  • Fixed or indexed price, and any escalator. A fixed price hedges against rising power prices and exposes you if market prices fall. An indexed price tracks the market.
  • Term and exit. Corporate PPAs commonly run 10 to 15 years. Ask what happens on a change of control, a site closure or a long outage.
  • Credit support. A long contract with a project company usually needs a guarantee or deposit, which has a cost.
  • On-site specifics. For a rooftop PPA, ask who owns the array at the end of the term, who insures the roof penetrations, and what happens if you need roof access.

Financial comparison

The two routes are not like for like, because they cover different volumes.

On-site solar replaces electricity you would otherwise import, so each kilowatt-hour generated saves your full delivered import price. If you buy the array, the Annual Investment Allowance gives a 100% deduction on the first £1m of qualifying plant and machinery spend in a year, with the 50% first-year allowance for special-rate spend above that (GOV.UK, Annual Investment Allowance); see the AIA article for the arithmetic. If a funder owns the array, the funder claims the allowance and you pay for the output instead.

A corporate PPA is a hedge rather than a capital return. You pay the contract price for the covered volume, and whether you gain depends on how it compares with what you would otherwise have paid. It needs no capital, but it carries counterparty risk and, in a fixed-price deal, basis risk.

The volumes show why you may need both. A hall that averages 5 MW of IT and cooling demand uses about 43,800 MWh a year (5 MW multiplied by 8,760 hours). A 1 MWp array at Slough is modelled by PVGIS 5.3 at about 932 MWh a year on a south-facing flat roof tilted 10 degrees with 14% losses, which is roughly 2% of that hall’s use (illustrative arithmetic). A rooftop is a margin measure at data centre scale; a corporate PPA can cover most of the load. For cost modelling of the rooftop side, use the cost page.

Scope 2 accounting

The GHG Protocol’s Scope 2 Guidance requires reporting under two methods. The location-based method uses the average emission factor for the grid, so neither a rooftop array nor a PPA changes that figure beyond the electricity you stop importing. The market-based method lets contractual instruments, including certificates bundled with a PPA, reduce the reported figure if they meet the Guidance’s quality criteria.

  • On-site solar: generation is metered at your site, which gives the clearest audit trail. Where the array qualifies, it can be accredited for REGOs; check eligibility with Ofgem.
  • Corporate PPA: the certificates are a valid market-based instrument, but auditors and customers increasingly ask about vintage, geography and additionality, so ask the generator what is bundled and how the certificates will be transferred and retired.

For the UK location-based factor and a calculator for the on-site offset, see the PUE and Scope 2 page.

Hourly CFE matching

24/7 CFE matching, meaning carbon-free supply in every hour rather than as an annual total, is the direction the largest hyperscale operators have set.

On-site solar generates in daylight hours only. In those hours a flat load absorbs almost every kilowatt-hour, so the matching is close to complete; in the other hours it contributes nothing. Wind generates more in winter and overnight, when solar is absent, which is why a wind-heavy PPA and a rooftop array complement each other. Neither alone matches every hour; closing the remaining gap needs storage, flexible demand or other firm supply, and the battery storage guide covers the storage side.

Risk and procurement

  • On-site solar carries equipment risk over the array’s life: module degradation, inverter replacement and roof access. The network side needs a G99 application before the array can be energised; see G99 for data centres.
  • Corporate PPAs carry counterparty risk (generator insolvency, force majeure, curtailment) and, if fixed-price, the risk that market prices fall below the contract price. Check how the contract treats curtailment compensation.
  • Procurement effort differs: a rooftop project needs structural, DNO and change-management work on site, while a corporate PPA needs legal, credit and treasury approval for a long commitment. Get more than one priced offer for either.

Questions to put to anyone quoting you a PPA

  1. Is it physical or virtual, and who carries the shape and imbalance risk?
  2. What is the price basis, the escalator and the term, and what are the exit and change-of-control terms?
  3. Which certificates are bundled, from which generator and vintage, and how are they retired in your name?
  4. For a rooftop PPA, who owns the array at the end of the term, and who is responsible for roof repairs and insurance?
  5. What credit support is required, and what happens if the generator or funder fails?
  6. Has the G99 application been discussed with your network operator, and who carries the delay risk?

The usual combination

For most UK data centres the sensible order is the rooftop array first, where the roof allows it, because it is auditable evidence at your own meter and needs no long off-site commitment. Add a corporate PPA for the volume a roof cannot cover, ideally with generation that complements solar’s daylight profile. Add storage if a customer contract requires hourly matching. At campus scale the PPA becomes the main instrument, and the rooftop remains the best-evidenced slice.

To ask a question about your own site, contact us or send an enquiry and we reply by email. The UK data centre map shows modelled rooftop yields by region.

Send an enquiry about your data centre

Four short steps. This site is a publisher, not an installer. We read every enquiry and reply by email.

1. Property → 2. Energy → 3. Postcode → 4. You
What kind of property is it?

Pick the closest match.

Roof size or energy spend?

Either one works — whichever you know.

What's the postcode?

Just the first part is fine (e.g. M3, B1, EH1).

Where should we reply?

No obligation. We reply by email.

By submitting, you agree to our privacy policy. We'll never sell your details.

What to ask any installer to evidence

  • MCS certification
  • NICEIC or NAPIT registration
  • G99 grid-connection evidence
  • BPSS clearance for restricted sites
  • Insurer-reviewed design
  • Insurance-backed workmanship warranty