Data centre solar insights
Technical and commercial analysis on solar PV for UK data centres — written for facilities managers, infrastructure directors, and sustainability teams.
28 October 2026
UK Data Centre Capacity: Why the Estimates Disagree
UK data centre capacity is 1.6 GW (DSIT), or 1,478 MW for 'London' (DC Byte), or about 1 GW in Greater London (GLA). Why the sources differ and how to quote them.
Read article →
18 October 2026
UK Data Centre Power Constraints: The West London Case
West London data centres face 7 to 13 year grid connection timelines. What the GLA report says, and what rooftop solar can and cannot do about it.
Read article →
25 June 2026
Can a Data Centre Run on Solar Power?
Can a data centre run on solar? Honestly: not 100% on rooftop alone. Here's the Tier III/IV-safe solar, BESS and grid architecture that works.
Read article →
25 June 2026
How to Choose a Data Centre Solar Installer
A procurement checklist for choosing a data centre solar installer: live-load method, security clearance, G99, MCS, references and insurer review.
Read article →
25 June 2026
Data Centre Electricity Cost UK: How Solar Offsets It
What UK data centres pay for electricity, how much of it on-site solar can offset on a flat 24/7 load, and where the savings stop. Sourced, dated figures.
Read article →
25 June 2026
How Many AI Data Centres Are There in the UK? (2026)
An honest 2026 estimate of how many AI data centres the UK has, why an exact count is hard, and what the build-out means for power and on-site solar.
Read article →
25 June 2026
Hyperscale Data Centre Solar: the UK Playbook
How UK hyperscale data centres deploy MW-scale rooftop and canopy solar for 24/7 carbon-free energy, with cost, yield and grid-connection benchmarks.
Read article →
25 June 2026
On-Site Solar PPA for Data Centres: Structure and Rates
How a behind-the-meter solar PPA works for data centres: ownership, p/kWh rates, escalators, term, IFRS 16 treatment, and when it beats a capex buy.
Read article →
25 June 2026
Solar PV for Server Farms: A Practical UK Guide
How UK server farms cut energy costs with on-site solar PV. Sizing, self-consumption, payback, the Annual Investment Allowance and the lighter G99 process
Read article →
12 June 2026
Data Centre Three Phase Electrical Works for Solar PV
Three-phase infrastructure, UPS integration and contractor accreditation for data centre rooftop solar — what M&E managers should scope in 2026.
Read article →
27 May 2026
BESS for Data Centres UK: Uses, Sizing and Value
How a BESS works at a UK data centre: peak shaving, flexibility revenue, backup and solar pairing, plus sizing arithmetic and questions to ask a supplier.
Read article →
27 May 2026
Data Centre Solar Buyers Guide: UK Checklist for 2026
What to specify, ask and check before buying solar for a UK data centre: Tier III/IV method, G99, sizing against IT load, tax relief and Scope 2 evidence.
Read article →
12 May 2026
PPA for Data Centres UK: On-Site vs Corporate PPA
How a UK data centre PPA works: on-site vs corporate PPA, Scope 2 treatment, hourly CFE, contract types and the questions to ask before you sign.
Read article →
8 May 2026
How Data Centres Prove Renewable Energy to Customers
What MCS certificates, REGOs, and half-hourly generation data actually prove — and what they don't. A guide for colocation operators answering customer
Read article →
5 May 2026
Edge Data Centre Solar UK: Economics and the 50-200 kW Case
Can rooftop solar work on a 50-200 kW edge data centre or telco site? An honest look at economics, grid limits and roof constraints. Sourced and dated.
Read article →
28 April 2026
Annual Investment Allowance for Data Centre Solar (2026)
How the Annual Investment Allowance (100% first-year relief to £1m) and the 50% first-year allowance apply to data centre solar PV, with a worked