Data Centres in Wales: Capacity, Newport and the South Wales AI Growth Zone
How much capacity Wales has, where it is, how large the proposals are, and what a rooftop array yields in Newport and Cardiff.
Wales had about 154 MW of colocation data centre capacity in 2024, the most of any nation or region outside London, according to the Department for Science, Innovation and Technology (London had 1,048 MW). Most of it sits at Newport and Cardiff. Planned schemes are far larger: the Welsh Parliament's research service lists a 200 MW proposal in Newport, around 600 MW in Bridgend, two Cardiff schemes of 148 MW and 150 MW, and 349 MW on Anglesey. Our operator-checked list (3 November 2026) has 3 operating Welsh sites, and South Wales is an AI Growth Zone.
How much data centre capacity does Wales have?
DSIT, Estimate of data centre capacity: Great Britain 2024 estimates 154 MW of colocation IT power in Wales in autumn 2024, about a tenth of Great Britain's 1.6 GW total. The estimate covers colocation facilities only, uses maximum rated IT load rather than electricity drawn, and was rounded by DSIT to avoid false precision. Enterprise data centres are excluded, so the true figure is higher.
| Region | Colocation IT power (MW), autumn 2024 |
|---|---|
| London | 1,048 |
| Wales | 154 |
| South East | 128 |
| South West | 53 |
| North West | 52 |
| East | 44 |
| Scotland | 30 |
| North East | 17 |
| Yorkshire and the Humber | 16 |
| West Midlands | 15 |
| East Midlands | 9 |
Source: DSIT, published 1 May 2025, re-read on 3 November 2026. Regions are ITL1/NUTS1; Northern Ireland is not covered. The UK-wide picture is on the UK data centres map and list.
Data centres in Wales: the sourced list
Three Welsh sites are confirmed as operating on the operator's or owner's own website. Vantage's campus page gives two different figures, 148 MW of critical IT load for the campus and "an existing 72MW of IT capacity and two additional facilities planned", so the table leaves the power column blank rather than pick one. The same rows sit under Wales on the UK data centre map.
| Facility | Operator | Town | IT power the operator states | Source (checked 3 November 2026) |
|---|---|---|---|---|
| Cardiff Data Centre | Keppel DC REIT | Cardiff | — | owner page |
| Cardiff (CWL1) Data Center Campus | Vantage Data Centers | Newport | — | operator page |
| St Asaph Data Centre (DC8) | iomart | St Asaph | — | operator page |
- Bridgend data centre campus (CWL4), former Ford engine plant (Bridgend)
- Vantage Data Centers (VDC CWL4 Limited): hybrid planning application P/25/247/HYB; officer recommendation to grant. Source.
- Vantage South Wales AI-ready capacity (Newport, Bridgend, Bro Tathan) (Newport / Bridgend / St Athan)
- Vantage Data Centers: planned. Source.
- Vantage CWL1 further buildings (Newport)
- Vantage Data Centers: planned. Source.
Newport and Cardiff: where the capacity is
The Newport campus at Imperial Park, operated by Vantage as CWL1, has been operational since 2010 and is described by its operator as one of Europe's largest data centre campuses, with electricity matched to 100% certified renewable energy (Vantage, 13 August 2026). It began as the Next Generation Data (NGD) conversion of a former LG factory of about 750,000 sq ft (Computerworld). Vantage brands the campus "Cardiff" on its own site, which is why searches for a Cardiff data centre often mean Newport. The city guide covers the Newport data centre campus and its roof.
In August 2026 Nebius agreed to lease high-density capacity at CWL1, which Vantage described as "the first announced commercial capacity commitment in the South Wales AI Growth Zone". Vantage also plans "more than 1GW of AI-ready capacity across Newport, Bridgend and Bro Tathan".
The pipeline is bigger than the estate
- Newport: one proposed scheme of 200 MW, larger than Wales's entire 2024 capacity.
- Cardiff: two proposals of 148 MW and 150 MW.
- Bridgend: a proposal of around 600 MW.
- Anglesey: a proposal of 349 MW.
Source: Senedd Research, 31 July 2026, re-read on 3 November 2026. Proposals are applications, not capacity; many will not be built at the stated size.
AI Growth Zones, energy and the grid
Wales has two AI Growth Zones, North Wales and South Wales. The UK Government expects about £10 billion of investment in the South Wales zone, which it says could harness over 1 GW by the early 2030s. For scale, 1 GW is about 13% of Wales's total electricity generation capacity of 7.9 GW in 2024. NESO held around 173 grid connection requests for new data centres in May 2026, over 100 GW across the UK queue (all per Senedd Research). The power plans published for each zone are on our AI Growth Zones page.
Wales already generates far more electricity than it uses: 22 TWh against 13 TWh consumed, with renewable generation equal to 55% of consumption in 2024, just over 1.4 GW of solar PV at the end of 2024, and 115 MW of battery storage operating with more than 2.3 GW consented (Energy Generation and Use in Wales, August 2026).
Two distribution network operators serve Wales. National Grid Electricity Distribution covers South Wales, about 1.2 million customers over 11,800 km² from Pembrokeshire to Monmouth and north to Aberaeron and Rhayader (NGED long-term development statement): that includes Newport, Cardiff and Bridgend. SP Energy Networks (SP Manweb) covers North Wales and Merseyside (Ofgem), including the iomart site at St Asaph and the North Wales zone. Planning is unsettled: Welsh planning policy does not currently mention data centres explicitly, unlike the frameworks in England and Scotland (Senedd Research).
What Welsh rules mean for a rooftop array
- Planning
- Part 43 Class A of the permitted development order as it applies in Wales covers solar on non-domestic buildings, with conditions: no more than 20 cm protrusion on walls and pitched roofs, no more than 1 m above a flat roof and not within 1 m of the roof edge, not in the curtilage of a listed building or on a scheduled monument, not on a road-facing wall or slope in a conservation area, and not within 3 km of an aerodrome since 2019. Stand-alone panels (Class B) are limited to 9 m². Part 43 is titled non-domestic microgeneration, so confirm with the local planning authority whether a data-centre-scale array falls within it (SI 2012/2318; SI 2019/330).
- Grid
- NGED in the south, SP Manweb in the north. A Transmission Impact Assessment is needed only above 5 MW in England and Wales since CMP446 (May 2025), where there are no fault-level issues, against 200 kW on mainland Scotland (NESO). Steps for the distribution application are on G99 for data centres.
- Business rates
- Plant used to generate, store, transform or transmit power mainly or exclusively from listed sources, including photovoltaics, is excepted from rates valuation from 1 April 2024 until before 1 April 2035 (SI 2023/1229). The Welsh Government describes it as relief for on-site renewables.
- Export
- The Smart Export Guarantee applies in Wales as in the rest of Great Britain, up to 5 MW (Ofgem). With a flat 24/7 load there is little to export.
- Lettings
- The non-domestic minimum energy efficiency standard applies in Wales: EPC E for new lets from 1 April 2018 and all lets from 1 April 2023; higher future bands are proposals only (SI 2015/962, reg 27). This matters to colocation landlords letting halls.
What Wales means for on-site solar
PVGIS 5.3 (EU Joint Research Centre, SARAH3 radiation data, 14% losses) models a flat roof tilted 10 degrees facing south at 946 kWh per kWp a year in Cardiff, 921 in Swansea and 876 in Wrexham (Cardiff query), and 938 at Newport, against 932 at Slough. At the optimal tilt Cardiff, Swansea and Wrexham give 1,044, 1,016 and 970. The same array yields about 15-18% less in Edinburgh or Glasgow (see data centres in Scotland).
Campus-scale roofs are the opportunity: the Newport buildings are large, flat and lightly obstructed, and the load is continuous, so nearly every kilowatt-hour is self-consumed. The limit is the one that applies everywhere: a rooftop array covers a small share of a hall's load (about 2% for 1 MWp on a 5 MW hall, by simple arithmetic) and does not shorten a grid queue.
Funding in Wales
No Welsh grant funds data-centre solar today. The Development Bank of Wales Green Business Loan Scheme names solar PV among its measures, but it is a loan, not a grant: for Wales-based businesses trading for two years or more, from £1,000 to £1.5m over terms of up to 15 years (Development Bank of Wales; Senedd written answer); batteries are not named. Ynni Cymru's 2026/27 round closed on 21 May 2026, and projects of solar PV plus battery storage only were ineligible (Welsh Government). Public bodies can use the Salix Wales Funding Programme at a fixed 2.45%%, with Invest to Save interest-free for bodies without borrowing powers (Salix). The comparison of routes is on how Welsh funding routes apply to data-centre solar.
Next steps: the Cardiff city guide for solar panels for data centres in Cardiff, and data centre solar costs.
Frequently asked questions
How much data centre capacity does Wales have?
DSIT estimated 154 MW of colocation data centre IT power in Wales in autumn 2024, the highest outside London (1,048 MW) and about a tenth of Great Britain's 1.6 GW. The estimate excludes enterprise data centres.
Where are Wales's data centres?
Most of the capacity is at Newport, where Vantage's CWL1 campus (formerly Next Generation Data) at Imperial Park has operated since 2010, and in Cardiff. Our operator-checked list also includes iomart's St Asaph site in North Wales. Planned schemes are proposed in Newport, Cardiff, Bridgend and Anglesey.
What is the South Wales AI Growth Zone?
A UK Government designation for sites along the M4 corridor from Newport to Bridgend. The government expects about £10 billion of private investment and says the zone could harness over 1 GW by the early 2030s. Vantage described Nebius's August 2026 lease at its Newport campus as the first announced commercial capacity commitment in the zone.
Does Welsh planning policy cover data centres?
The Welsh Parliament's research service reports that Welsh planning policy does not currently mention data centres explicitly, unlike the planning frameworks in England and Scotland. Check the current position with the local planning authority.
How much electricity does a solar panel produce in Newport?
PVGIS 5.3 models 938 kWh per kWp a year at Newport for a south-facing flat roof tilted 10 degrees with 14% system losses, and 946 at Cardiff, compared with 932 at Slough and 805 in Edinburgh.
Do rooftop panels on a Welsh data centre pay business rates?
SI 2023/1229 excepts plant used to generate, store, transform or transmit power mainly or exclusively from listed renewable sources, including photovoltaics, from rates valuation from 1 April 2024 until before 1 April 2035. The Welsh Government describes it as relief for on-site renewables.
Is a Welsh data-centre roof array permitted development?
Part 43 Class A covers solar on non-domestic buildings in Wales with conditions: 20 cm protrusion on walls and pitched roofs, no more than 1 m above a flat roof and 1 m back from the edge, not in listed-building curtilage, and not within 3 km of an aerodrome. Part 43 is framed as microgeneration, so confirm a large array with the local planning authority.
Thinking about solar for a Welsh data centre roof?
Four short steps. This site is a publisher, not an installer. We read every enquiry and reply by email.